Gradually powering up

Viking Electric returned today to finish the work they’d begun yesterday on burying conduit from where the main electrical service panel will be located in the garage, under the breezeway, and into the house. Scott and his crew also finished installing temporary power next to the garage to support contractors’ work in the weeks ahead. At this point, all is ready for Koball’s to return later this week to pour the garage and cellar slabs.

Comments

Location

Lanesboro, Minnesota
Climate Zone 6 (cold/moist)
Latitude: 43° 44' 18'' N
Longitude: 91° 54' 48'' W

House Size

Net Treated Floor Area: 1,514 SF
Gross Square Footage (House only): 2,210 SF

Building Envelope

Roof: R-99
Wall: R-61
Ground: R-53

Windows & Doors

Glazing: U-0.10 BTU / hour / sq. ft.
Solar Heat Gain Coefficient (SHGC): 0.48”
Frame: U-0.19 BTU / hour / sq. ft.

Modeled Performance

Specific Primary Energy Demand (Source Energy Demand): 12.1 kBTU / sq. ft. / year

Specific Space Heat Demand: 7.0 kBTU/sq. ft. / year

Peak Heating Load: 7,047 BTU / hour

Space Cooling Demand: 0.44 kBTU / sq. ft. / year

Peak Cooling Load: 3,625 BTU / hour

Pressure Test Goal: Whole House Air Changes Per Hour (ACH) = 0.4 ACH 50

×

Post a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

×

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.